PostMar 29, 2014#76

That's awesome. Hopefully it attracts a more ethnic population to live nearby.

8,155
Life MemberLife Member
8,155

PostMar 29, 2014#77

Completed 2014

Fields Foods new construction grocery (Bohemian Hill)
Renovation of vacant 2709 Cherokee into Los Punk. (Multiple additional properties to come)
Stan Span
Renovation of 1425 Salisbury into Sun Cafe
London Tea Room renovation of Hyde Park Building on Morgan Ford (relocation/expansion from Wash Ave.)
Urban Chestnut in the Grove (conversion of Rennard Paper facility)
Gallery 515 apartments (102 units) (Millennium Center 11 floor apartment conversion)
Lacassian Lofts -- 2200 Locust (27 units + ground floor commercial)
Cortona @ Forest Park (278 units)
@4240 - CIC at Cortex (occupied but official "grand opening" to come)
t-rex move - renovation of occupied Lammert Building
Bride's House commercial renovation (1010 Locust)
Rehab of 2800 Shenandoah for Purple Martin bar/restaurant
CitiParc at Pine Senior Housing redevelopment of vacant Plaza Square building (149 units)
Ball Park Village Live
Universal Foods renovation of vacant big box grocery- 4330 S. Broadway (global foods store)
Tower Grove Mews mixed-use development (partially open; project completion set for this Spring)
Renovation of vacant 2714 Lafayette into commercial
Lacledes Lofts - renovation of 3965 Laclede (50 units)
The Ready Room - renovation of 4195 Manchester in The Grove
The Station Gourmet Market and Event Space -- renovation of 2232 Thurman Art Deco gas station
Park Avenue Coffee renovation of vacant Columbia Ave. warehouse for retail and office/roasting center

Expected Completions 2014

Transportation
Partial Completion of Arch Project street work (new on/off ramps, Texas turn-around, replacement of Walnut St. Bridge, removal of Chestnut and Market bridges, completion of south portion of Central Riverfront Trail/LKSullivan, demo of Arch parking garage and closure of Washington)
New I-64 bridges/Tower Grove Interchange

Downtown
Vacant Globe Drug Building to U-Haul retail and storage facility
Tower OPOP (128 units)
Mayfair Hotel conversion and upgrade to Magnolia Hotel
Bissinger's Chocolates -- N. RIverfront vacant building renovation
Union Station (first phase of large renovation)
1915 Olive (old AG Edwards building) conversion to new Police HQ
Old Cathedral renovation
Laclede's Landing Plaza & 3rd Street streetscape
Plaza Square garage & improvements (intended to create high occupancy rates)

Central Corridor
Mixed-use Wash U Delmar new construction
Aventura Phase II (102 units)
4011 Delmar (Renovation into Residential for Veterans) (68 units)
Terry Park homes in Gate District (25 single family homes)
UIC rehab of 1520 S. Vandeventer for IT company (Summer opening)
Conversion of vacant CWE St. John's UMC into Link Auction Galleries (goal of March opening)
245 Union residential project (expected late 2014 completion) (88 units)
Salvation Army Harbor Square Rehab (58 units at Wash & Garrison)
Shriner's Hospital
Cortex Commons
Public Media Commons
Sun Theater
Missouri Theater Building - BB King's and other Commercial Space (108 unit residential portion slated for 2015 completion)
Mercedes-Benz of Saint Louis (relocation from Ellisville)
Modern Brewing renovation of 5231 Manchester

South City
Farmers & Merchant and Lutz buildings renovation into "Southside Station" mixed-use development (39 units)
Renovations of underutilized Cherokee St. Buildings -- 2648 (Bespoke) 2728 (Yaqui's) 2732 (Craft Art Bar) 2701(Luminary)
2622 Cherokee container infill for Empire Cafe
Adaptive Rehab of Kinloch Telephone Exchange Building 2201 Indiana
Bailey's Rooster rehab of vacant mid-modern South Grand bank building
3612 Hartford mixed-use renovation (just off S. Grand)
Subway/mixed-use building Soulard (apts up top; previously vacant lot)
Subway/mixed-use building S. Kingshighway (office up top; demo of existing buildings)
Grapeseed renovation of 5400 Nottingham
Peter Mathews Memorial Skate Garden -- 4415 Morgan Ford vacant lot (expected May opening)
Renovation of 5351 Murdoch - bar/restaurant & retail first floor, apartments above

North City
Flance Early Learning Center (1908 O'Fallon - Carr Square new construction)
North Sarah Apartments Phase II - mixed use (103 units + commercial)
"Blossom House" renovation - 5331 Enright
Bremen Homes infill development in Hyde Park (40 homes)

2014 Expected Construction Starts with post-2014 completion

Downtown
Chemical Building (approx. 120 units) (mid-2015 opening)
Arcade-Wright (282 units + major institutional use (Webster U?))
The Alverne Building - 1014 Locust (81 units)
2015 Lucas "Intrada Lofts" (57 units)
1900 Pine (87 units)
1214 Washington mixed-use (5 units + first floor commercial)
Arch grounds
Gen Am Building renovation for Laclede Gas move
National Blues Museum (615 Washington Ave in the M/X District)
Renovation of vacant 1011 Olive for Dave Bailey bbq joint and rooftop bar (old Bussone's building)

Central Corridor
Beaumont Building 2650 Locust 70 unit, market rate rehab (projected fall construction start and late 2015 finish)
"The Standard" 164 unit, 465 bed new residential; demo of Mobil Gas Station (August 2015 opening)
Renovation of Gerhart Block for ground floor commercial and 17 lofts above (across from IKEA)
City Walk/Whole Foods mixed-use (under construction w/ 2015 completion; 177 units)
West Pine Lofts (206 units) (new construction at 4034 W. Pine - demo of some existing properties
Botanical Grove (ongoing UIC rehab and modern infill single family homes)
4643 Lindell mixed-use tower (217 units)
IKEA - Cortex (2015 completion) (August 2015 opening)
Crescent Building rehab to residential - Cortex
WUMC McKinley Research Building (already begun - 2015 completion)
BJC hospital buildings
STLCOP Phase I
Home2Suites Hilton in FPSE
Loop Trolley (finally!)
Conversion of vacant CWE church into Cathedral Square Brewery (500 N. Kingshighway)
Demo of existing/construction of new Commerce Bank @ Manchester & Vandeventer
AT Still Dental in City Hospital complex (April construction commencement)

South City
S. Knghwy Viaduct
youth treatment facility at Grand & Gravois
24 single-family Mississippi Bluffs project on S. Broadway
16 single-family Detonty Close project in Shaw

North City
Northside Regeneration (not sure of anything slated to be completed in '14, but I believe streetscaping will begin for Cass and Jefferson and the Saint Louis Place pilot homes may get underway)
Cardinal Ritter former campus redevelopment into Vets housing

592
Senior MemberSenior Member
592

PostMar 30, 2014#78

It never got mentioned here, but 5351 Murdoch (Macklind and Murdoch) has been undergoing a gut rehab this winter and spring. It's supposed to be an upscale Irish pub plus retail storefronts plus upstairs apartments when finished this year.

8,155
Life MemberLife Member
8,155

PostMar 31, 2014#79

^ Thanks; now added.

PostApr 01, 2014#80

No April Fooling, Laclede Lofts now open for move-ins! Also updated ^^ to include the DeTonty Close project by UIC and the awesome rehab of 2714 Lafayette for commercial.

PostApr 01, 2014#81

Nice first quarter of openings!

Completed 2014

Fields Foods new construction grocery (Bohemian Hill)
Renovation of vacant 2709 Cherokee into Los Punk. (Multiple additional properties to come)
Stan Span
Renovation of 1425 Salisbury into Sun Cafe
London Tea Room renovation of Hyde Park Building on Morgan Ford (relocation/expansion from Wash Ave.)
Urban Chestnut in the Grove (conversion of Rennard Paper facility)
Gallery 515 apartments (102 units) (Millennium Center 11 floor apartment conversion)
Lacassian Lofts -- 2200 Locust (27 units + ground floor commercial)
Cortona @ Forest Park (278 units)
@4240 - CIC at Cortex (occupied but official "grand opening" to come)
t-rex move - renovation of occupied Lammert Building
Bride's House commercial renovation (1010 Locust)
Rehab of 2800 Shenandoah for Purple Martin bar/restaurant
CitiParc at Pine Senior Housing redevelopment of vacant Plaza Square building (149 units)
Ball Park Village Live
Universal Foods renovation of vacant big box grocery- 4330 S. Broadway (global foods store)
Tower Grove Mews mixed-use development (partially open; project set for completion this Spring)
Renovation of vacant 2714 Lafayette into commercial


much more to come this month! Laclede Lofts opened today and RU Ready for tomorrow?

PostApr 02, 2014#82

Residential Completed 2014

Gallery 515 apartments (102 units) (Millennium Center 11 floor apartment conversion)
Lacassian Lofts -- 2200 Locust (27 units + ground floor commercial)
Cortona - (278 units)
CitiParc at Pine Senior Housing redevelopment of vacant Plaza Square building (149 units)
Tower Grove Mews mixed-use development (10 units)
Laclede Lofts (50 units)

If my maths are right that is 616 units added to the central corridor in the last few months... not bad! (I think some at Gallery 515 and Lacassian were available tail end of 2013, but still!) Looking ahead, Tower OPOP and Southside Station are scheduled for this Spring adding another 150 or so and it looks like Aventura II and North Sarah II are coming along nicely adding another 200... we'll easily surpass 1,000 new multi-family units this year... probably that many alone just in the Central Corridor. 2015 already looks great, too, depending upon the Arcade and Chemical.

edit: 2015 looks even greater with building permit issued for West Pine Lofts' 206 units!

PostApr 02, 2014#83

Two exciting openings today in rehabbed buildings in the Greater Grove.... Union Studio in Tower Grove Mews and Of Montreal opens The Ready Room on Manchester tonight.

PostApr 02, 2014#84

wow, what a week.... permit issued for West Pine Lofts. Adding 206 units!

PostApr 02, 2014#85

Multi-family Residential

Completed 2014

Gallery 515 apartments (102 units) (Millennium Center 11 floor apartment conversion)
Lacassian Lofts -- 2200 Locust (27 units + ground floor commercial)
Cortona @ Forest Park (278 units)
CitiParc at Pine Senior Housing redevelopment of vacant Plaza Square building (149 units)
Tower Grove Mews mixed-use development (10 units)
Lacledes Lofts - renovation of 3965 Laclede (50 units)
sub-total: 616

Expected Completions 2014

Downtown
Tower OPOP (128 units)

Central Corridor
Mixed-use Wash U Delmar new construction (240 units)
Aventura Phase II (102 units)
4011 Delmar (Renovation into Residential for Veterans) (68 units)
245 Union residential project (expected late 2014 completion) (88 units)
Salvation Army Midtown Rehab (58 units)
sub-total: 556

South City
Farmers & Merchant and Lutz buildings renovation into "Southside Station" mixed-use development (39 units)

North City
North Sarah Apartments Phase II - mixed use (103 units + commercial)

Total for 2014 expected completions: 1,500+

2014 Expected Construction Starts with post-2014 completion

Downtown
Chemical Building (approx. 120 units) (mid-2015 opening)
Arcade-Wright (282 units+ major institutional presence (Webster?))
The Alverne - 1014 Locust (81 units)
2015 Lucas "Intrada Lofts" (57 units)
1900 Pine (87 units)
1214 Washington (5 units + first floor commercial)
sub-total: 632

Central Corridor
Beaumont Building 2650 Locust 70 unit, market rate rehab (projected fall construction start and late 2015 finish)
"The Standard" 164 unit, 465 bed new residential; demo of Mobil Gas Station (August 2015 opening)
Renovation of Gerhart Block for ground floor commercial and 17 lofts above (across from IKEA)
City Walk/Whole Foods mixed-use (under construction w/ 2015 completion; 177 units)
Missouri Theater Building - (108 unit residential portion slated for 2015 completion)
West Pine Lofts (206 units) (new construction at 4034 W. Pine - demo of some existing properties
OPUS Lindell Tower (217 units)
Crescent Building rehab to residential - (unknown #) Cortex
sub-total: 956+

Total post-2014 completions: 1,590+

For post 2014 completions, I have yet to add the proposed Steve Smith mid-modern renovation (16) on Lindell. I'm also expecting an announcement anytime on the Cortex mixed-use project on FPP and we may here plans this year for downtown towers by Drury and Cardinals and new construction in Grand Center by Smith.

(edited to add the OPUS tower)

PostApr 03, 2014#86

This week -- and Saint Louis Neighborhood Development Blog -- keeps bringing the good news! Added 1214 Washington, for which building permit has been submitted for commercial rehab of ground floor and 5 units above.... this used to be the Mossa furniture building.



The blog also reports that the Arcade-Wright permit for $75 million has been submitted and work is planned to begin next month. Also, two-family infill is coming to Olive in the CWE (not adding due to limited scope but great to see the infill continue.)

PostApr 04, 2014#87

Added awesome Station market renovation of art deco gas station in Shaw to completions and awesome container infill on Cherokee for expected completions.

PostApr 09, 2014#88

Added 1011 Olive renovation for Dave Bailey bbq joint and rooftop bar.

PostApr 09, 2014#89

edited to add OPUS Tower as permit has been submitted.

PostApr 15, 2014#90

Anybody got anything to suggest to add for city projects? Been kind of lull after brisk activity.

1,320
Veteran MemberVeteran Member
1,320

PostApr 15, 2014#91

There are a little vague.

SAG Properties (same owners of the Castle Ballroom) continue to buy up and renovate smaller properties in the 2800 and 2900 blocks of Locust and Olive.

Also, I'm expecting the five-story building at 2647 Locust (across from the planned telephone exchange renovation) to be renovated. Probable residential... maybe around 15 units?

8,155
Life MemberLife Member
8,155

PostApr 16, 2014#92

^ That's a nice building on Locust.... hopefully this all comes together; with The Beaumont and this, I'd think the adjacent two-story would have a strong chance of redeveloping in short order as well. So was T.S. Elliot born right around there?

933
Super MemberSuper Member
933

PostApr 16, 2014#93

I thought his place was near Diablo in Midtown. I was told it was like right next to that building but I could be wrong. I read part of a book about him when I was in Seattle and it showed his old house and I knew where it was at the time but have since forgotten. I think it was around that area, though.

8,155
Life MemberLife Member
8,155

PostApr 16, 2014#94

^ 2635 Locust was his birth home.... so what if a bar opens up in the vicinity called the Wasteland with a T.S. Elliot/Saint Louis literary theme?

PostApr 16, 2014#95

Completed 2014

Downtown
Gallery 515 apartments - 515 Olive (102 units; Millennium Center 11 floor apartment conversion)
Lacassian Lofts -- renovation of 2200 Locust (27 units + ground floor commercial)
CitiParc at Pine - 1531 Pine (149 senior housing units; was vacant Plaza Square Building)
Tower OPOP - 411 N. 8th (128 units + ground floor restaurant)
Stan Span and N. Tucker
t-rex move - renovation of occupied Lammert Building- 911 Washington
Ball Park Village Phase One
1010 Locust commercial renovation (old Bride's House Building)
U-Haul retail and storage facility occupying vacant "Globe Drug" Buildings - 418 S. Tucker

Central Corridor
Cortona @ Forest Park - 5800 Highlands Plaza Dr. (278 units)
Lacledes Lofts - renovation of 3965 Laclede (50 units)
Aventura at Forest Park Phase II - 4431 Chouteau (50 units)
Tower Grove Mews- Tower Grove & McRee (10 apartments + office and retail; partially open)
@4240 - Cortex (conversion of 4240 Duncan warehouse)
Fields Foods - 1500 Lafayette
UCBC Grove Brewery & Bierhall - 4465 Manchester (conversion of commercial building)
St. John's UMC conversion into Link Auction Galleries - 5000 N. Washington (at Kingshighway)
2714 Lafayette renovation into commercial/office (Gate District)
4195 Manchester renovation for the Ready Room (The Grove)

South City
2709 Cherokee renovation for Los Punk
2846 Cherokee renovation for Master Pieza's Pizza
2732 Cherokee for Art Bar
2728 Cherokee for Yaqui's
3128 Morgan Ford renovation for London Tea Room (Hyde Park Beer Building)
2800 Shenandoah renovation for Purple Martin bar/restaurant
4330 S. Broadway renovation for Universal Foods (formerly vacant big box grocery)
2232 Thurman renovation for The Station Gourmet Market and Event Space (Art Deco gas station)
5105 Columbia renovation for Park Avenue Coffee (retail and office/roasting center)
1704 S. Broadway renovation for R-Space and Café (art gallery & coffee shop)

North City
1425 Salisbury renovation into Sun Café
Flance Early Learning Center - 1908 O'Fallon (Carr Square/Murphy Park new construction)

Expected Completions 2014

Transportation
Partial Completion of Arch Project street work (new on/off ramps, Texas turn-around, replacement of Walnut St. Bridge, removal of Chestnut and Market bridges, completion of south portion of Central Riverfront Trail/LKSullivan, demo of Arch parking garage and closure of Washington)
New I-64 bridges/Tower Grove Interchange

Downtown
Mayfair Hotel conversion and upgrade to Magnolia Hotel - 421 N. 8th
Union Station renovation - Phase One
New Police HQ -1915 Olive (conversion of old AG Edwards building)
Old Cathedral renovation
Laclede's Landing Plaza & 3rd Street streetscape; cobblestone re-laying
Plaza Square improvements, including new garage (intended to create high occupancy rates)

Central Corridor
Mixed-use Wash U Delmar new construction
4011 Delmar (Renovation into Residential for Veterans) (68 units)
Terry Park homes in Gate District (25 single family homes)
1520 S. Vandeventer renovation for new IT company
245 Union residential project (expected late 2014 completion) (88 units)
Salvation Army Harbor Square Rehab (58 units at Wash & Garrison)
Shriner's Hospital
Cortex Commons
Public Media Commons
Sun Theater
Missouri Theater Building - BB King's and other Commercial Space (108 unit residential portion slated for 2015 completion)
Mercedes-Benz of Saint Louis (relocation from Ellisville)
5231 Manchester renovation for Modern Brewing
908 Lafayette for Mission Taco Joint
Saint Louis Zoo South Campus clearance of FP Hospital and temporary parking replacement

South City
Farmers & Merchant and Lutz buildings renovation into "Southside Station" mixed-use development (39 units) (S. Grand & Gravois)
2612 Wyoming (former Garfield School) renovation for supportive housing (25 apartments)
Renovations of underutilized Cherokee St. Buildings -- 2648 (Bespoke) & 2701(Luminary)
2622 Cherokee container infill for Empire Cafe
Adaptive Rehab of Kinloch Telephone Exchange Building 2201 Indiana
3159 S. Grand rehab for Bailey's Rooster (currently vacant mid-modern bank building)
3612 Hartford mixed-use renovation (just off S. Grand)
Subway/mixed-use building - 1831 S. 7th (2nd floor residential; previously vacant lot)
Subway/mixed-use building - 1151 S. Kingshighway (2nd floor office; demo of existing buildings)
5400 Nottingham renovation for Grapeseed
Peter Mathews Memorial Skate Garden -- 4415 Morgan Ford vacant lot (expected May opening)
Renovation of 5351 Murdoch - bar/restaurant & retail first floor, apartments above

North City
North Sarah Apartments Phase II - mixed use (103 units + commercial)
Bremen Homes infill development in Hyde Park (40 homes)
"Blossom House" renovation - 5331 Enright
1600 N. Broadway renovation of vacant warehouse for Bissinger's Chocolates


2014 Expected Construction Starts with post-2014 completion

Downtown
Under Construction
The Alverne Building (1014 Locust) (81 units)
1214 Washington mixed-use (5 units + first floor commercial)
Arch grounds & Central Riverfront Trail
Gen Am Building renovation for Laclede Gas office relocation

Planned
Chemical Building (approx. 120 units)
Arcade-Wright - 800 Olive (282 units + major institutional use (Webster U?))
2035 Lucas "Intrada Lofts" (57 units)
1900 Pine (87 units)
National Blues Museum - 615 Washington Ave
Laclede's Landing/Arch Third Street Garage with ground floor retail (current vacant lot)
1011Olive renovation for Dave Bailey bbq joint and rooftop bar (old Bussone's building)
Convention Center demo of existing garage and ballroom expansion and new mixed-use parking garage

Central Corridor
Under Construction
City Walk/Whole Foods mixed-use (177 units; 2015 opening)
West Pine Lofts - 4034. W. Pine (206 units) (new construction)
Botanical Grove (ongoing UIC rehab and modern infill single family homes)
"The Standard" - 3853 Forest Park Ave. (164 unit, 465 bed new residential; August 2015 opening)
Gerhart Block mixed-use renovation (17 units)
WUMC McKinley Research Building (Taylor & McKinley)
STLCOP Phase I (Taylor and Parkview Place)
Commerce Bank @ Manchester & Vandeventer (replace existing)
AT Still Dental (City Hospital complex)

Planned
City Hospital 62 apartments; unclear on new construction or added to Georgian
Beaumont Building (2650 Locust) 70 unit, market rate rehab (projected fall construction start and late 2015 finish)
4643 Lindell mixed-use tower (217 units)
4100 Lindell (Remington Rand Mid-Modern) renovation into mixed-use (16 units)
Silo Lofts - Cortex (mixed-use unknown number of residential units)
IKEA - Cortex (2015 completion) (August 2015 opening)
4340 Duncan (Crescent Building) rehab to residential (unknown # of units)
BJC Kingshighway building replacements & 3,000 space Duncan/Newstead parking garage
Home2Suites Hilton in FPSE
Loop Trolley (finally!)
Conversion of vacant CWE church into Cathedral Square Brewery (500 N. Kingshighway)

South City
S. Knghwy Viaduct
youth treatment facility at Grand & Gravois
24 single-family Mississippi Bluffs project on S. Broadway
16 single-family Detonty Close project in Shaw

North City
Northside Regeneration (not sure of anything slated to be completed in '14, but I believe streetscaping will begin for Cass and Jefferson and the Saint Louis Place pilot homes may get underway)
Cardinal Ritter former campus redevelopment into Vets housing
Mallinckrodt major investment in new North Riverfront buildings

Keep an Eye On - Upcoming Announcements, Rumors and Innuendo
304 N. Broadway conversion to residential (old vacant Marquette Y)
Proposed 14 story, 200 unit residential tower at current Optimists' Lindell Building
Possible 2647 Locust conversion to residential (across from proposed Beaumont Building project)
Possible residential tower by Drury at Washington and Third (currently vacant lot)
Possible BPV residential tower
Possible Brauer Building conversion to TechShop-Cortex (4260 Forest Park Ave)
Skinker/Oakland/Clayton/64 intersection treatments (expected 2015 commencement)
Green Street Properties building in former Carondolet Coke site

PostApr 16, 2014#96

^ Added the Silo Lofts - Cortex Project although details won't be known until developer selected after May 1 RFP deadline.

512
Senior MemberSenior Member
512

PostApr 16, 2014#97

roger wyoming II wrote:^ 2635 Locust was his birth home.... so what if a bar opens up in the vicinity called the Wasteland with a T.S. Elliot/Saint Louis literary theme?
Ha. Already on my "if I win the lottery" project list. Only I was going to call it Noilly Cat...based on info in a recent Distilled History post on T.S. Eliot.

There's a bar called Wilde on Chicago's northside which has (or had) a heavy focus on Oscar Wilde and his works. The staff's shirts all had quotes, books and plays lined some of the walls. I think they've moved away from the theme a bit though...

8,155
Life MemberLife Member
8,155

PostApr 16, 2014#98

^ cool stuff.... But maybe we should go with J Alfred Prufrock's? My other idea was Naked Lunch for the Citygarden restaurant.

PostApr 25, 2014#99

Added 2846 Cherokee Street storefront rehab for Master Pieza's Pizza... now open.

http://blogs.riverfronttimes.com/gutche ... street.php

Looks like enough of an upgrade to what was there before (and I like the blade sign). Plus, hadn't have much of late.

PostApr 25, 2014#100

Reformatted ^^^^ for corridor consistency and to reflect construction start versus planned.