$169m is all in, including $40m acquisitionframer wrote: ↑Aug 25, 2024I was thinking this was for all three towers. $169 million to rehab just one tower seems crazy.
https://www.stlouis-mo.gov/government/d ... Agenda.pdf
Cost break down
$169m is all in, including $40m acquisitionframer wrote: ↑Aug 25, 2024I was thinking this was for all three towers. $169 million to rehab just one tower seems crazy.
Garage is part of the Mansion house renovation, i think and building more floors downGoHarvOrGoHome wrote: ↑Sep 18, 2024I wouldn't be surprised if the garage was the sticking point on the City Place redevelopment. Perhaps it's been fixed to some extent by now but I walked through it and on the platform above and it's clear there was some serious structural issues
There is work on the plaza in front but not the building facade.DogtownBnR wrote: ↑Sep 29, 2025Would the renovations include any exterior work? Sorry if this has been mentioned. Haven't kept up with this story.
The outside of these buildings could use a reclad or something to make them look more modern. Very bland at this point. Would love to see them modernized & lit up.
It would make the buildings more attractive to tenants, but I'm sure it would be cost-prohibitive to reclad. Adding lighting would be cheaperdbInSouthCity wrote: ↑Sep 29, 2025There is work on the plaza in front but not the building facade.DogtownBnR wrote: ↑Sep 29, 2025Would the renovations include any exterior work? Sorry if this has been mentioned. Haven't kept up with this story.
The outside of these buildings could use a reclad or something to make them look more modern. Very bland at this point. Would love to see them modernized & lit up.