The end of that garage that was supposed to connect to the auditorium looks horrible as it was never designed to be seen, I wonder what the plan is.
Sent from my iPhone using Tapatalk
Sent from my iPhone using Tapatalk
I am a little confused also. Why are all these things getting cut? Or are they just getting delayed or what exactly? Are they putting anything between the new building and the parking garage where the hole is still? or is that not happening also.The Mayor wrote: I'm still very flummoxed by this. Why hasn't there been any news coverage of the changing plans? You would have thought the BJ would have had at least a blurb. Maybe things are on hold during the WellCare acquisition?
Confusion is a good word as you literally got Forsyth and Kummer developments in the works that suggest the demand is there for more Clayton CBD square footage. So take away the performing arts, auditorium part and seems like the rest of the phase development would continue to progress. Maybe I'm missing some there as well as it relates to demand.jshank83 wrote:I am a little confused also. Why are all these things getting cut? Or are they just getting delayed or what exactly? Are they putting anything between the new building and the parking garage where the hole is still? or is that not happening also.The Mayor wrote: I'm still very flummoxed by this. Why hasn't there been any news coverage of the changing plans? You would have thought the BJ would have had at least a blurb. Maybe things are on hold during the WellCare acquisition?
wabash wrote:Maybe years of sitting unfinished until Clayton coerces then into “beautifying” it, as they did with the big concrete edifice on the western edge of the Centene campus.
I'm not sure if you mean in Clayton or in St. Louis as a whole, but they recently opened office space in the City and just bought the old Scottrade building at 270 and Manchester and plan on spending millions to renovate it. Seems like they still have a need for new office space in the region. My guess would be the delay is related to WellCare, but I really have no idea.moorlander wrote: After reviewing the docs. No PAC = No $75 million in incentives.
A few theories:
1. Centene is having trouble recruiting here and is moving offices elsewhere.
2. Monies are needed for WellCare deal, this postponing.
3. After WellCare deal, Centene needs this space for more office.
No worries lol, I typed that first part from memory before I looked up the BJ article. Either way, seems they still have a need for space in the region, hopefully they're just slowing things down for WellCare.moorlander wrote: Sorry to nitpick but they didn't buy it. They are leasing it.
Didn't realize that. Sorry to hear it.moorlander wrote:Centene pulled the plug on that too.wabash wrote:Maybe years of sitting unfinished until Clayton coerces then into “beautifying” it, as they did with the big concrete edifice on the western edge of the Centene campus.
The residential building and the PAC are out. The area between the building and the garage will be another garage. Apparently Centene will be “beautifying” some of these blank walls eventually but what was proposed earlier this year, https://nextstl.com/2019/01/new-mural-p ... za-garage/ , went back to the drawing board.jshank83 wrote:So is all that is being scrapped the performing arts center? Just trying to nail down exactly what is and isn't being built. What is going between the parking garage and new building? I couldn't find a updated site plan (it has changed multiple times and I can only find the really old ones)
I guess i didn't realize it was a sea of garages going in there. Funmoorlander wrote:The residential building and the PAC are out. The area between the building and the garage will be another garage. Apparently Centene will be “beautifying” some of these blank walls eventually but what was proposed earlier this year, https://nextstl.com/2019/01/new-mural-p ... za-garage/ , went back to the drawing board.jshank83 wrote:So is all that is being scrapped the performing arts center? Just trying to nail down exactly what is and isn't being built. What is going between the parking garage and new building? I couldn't find a updated site plan (it has changed multiple times and I can only find the really old ones)
No way they spend half a billion dollars to leave. A large number of board members half deep stl roots.framer wrote: I don't even want to think of the worst-case-scenario of them maybe moving their HQ out of STL?