The end of that garage that was supposed to connect to the auditorium looks horrible as it was never designed to be seen, I wonder what the plan is.


Sent from my iPhone using Tapatalk

4,553
Life MemberLife Member
4,553

PostJul 11, 2019#1302

Maybe years of sitting unfinished until Clayton coerces then into “beautifying” it, as they did with the big concrete edifice on the western edge of the Centene campus.

sc4mayor
sc4mayor

PostJul 11, 2019#1303

I'm still very flummoxed by this.  Why hasn't there been any news coverage of the changing plans?  You would have thought the BJ would have had at least a blurb.  Maybe things are on hold during the WellCare acquisition?

3,960
Life MemberLife Member
3,960

PostJul 11, 2019#1304

The Mayor wrote: I'm still very flummoxed by this.  Why hasn't there been any news coverage of the changing plans?  You would have thought the BJ would have had at least a blurb.  Maybe things are on hold during the WellCare acquisition?
I am a little confused also. Why are all these things getting cut? Or are they just getting delayed or what exactly? Are they putting anything between the new building and the parking garage where the hole is still? or is that not happening also. 

12K
Life MemberLife Member
12K

PostJul 11, 2019#1305

Clayton Lake won't go away without a fight, is seems. 

5,704
Life MemberLife Member
5,704

PostJul 11, 2019#1306

jshank83 wrote:
The Mayor wrote: I'm still very flummoxed by this.  Why hasn't there been any news coverage of the changing plans?  You would have thought the BJ would have had at least a blurb.  Maybe things are on hold during the WellCare acquisition?
I am a little confused also. Why are all these things getting cut? Or are they just getting delayed or what exactly? Are they putting anything between the new building and the parking garage where the hole is still? or is that not happening also. 
Confusion is a good word as you literally got Forsyth and Kummer developments in the works that suggest the demand is there for more Clayton CBD square footage.   So take away the performing arts, auditorium part and seems like the rest of the phase development would continue to progress.   Maybe I'm missing some there as well as it relates to demand.   

As far as BJ reporting, I'm assuming Centene at this time isn't willing to quote or comment on the record and therefore it is tough for the biz journal to put out an article without a legitimate quote or source to work off.  Otherwise they might as well give me a shout or quote me for the less than two cents its worth.   But it would sure be nice if Centene would give an update.  

8,905
Life MemberLife Member
8,905

PostJul 11, 2019#1307

After reviewing the docs. No PAC = No $75 million in incentives.

A few theories:
1. Centene is having trouble recruiting here and is moving offices elsewhere.
2. Monies are needed for WellCare deal, this postponing.
3. After WellCare deal, Centene needs this space for more office.

PostJul 11, 2019#1308

wabash wrote:Maybe years of sitting unfinished until Clayton coerces then into “beautifying” it, as they did with the big concrete edifice on the western edge of the Centene campus.

Centene pulled the plug on that too.

PostJul 11, 2019#1309

At least the new childcare/Centene university property looks amazing. And is scheduled to open in August/September.

sc4mayor
sc4mayor

PostJul 11, 2019#1310

moorlander wrote: After reviewing the docs.   No PAC = No $75 million in incentives.

A few theories:
1. Centene is having trouble recruiting here and is moving offices elsewhere.
2. Monies are needed for WellCare deal, this postponing.
3. After WellCare deal, Centene needs this space for more office.
I'm not sure if you mean in Clayton or in St. Louis as a whole, but they recently opened office space in the City and just bought the old Scottrade building at 270 and Manchester and plan on spending millions to renovate it.  Seems like they still have a need for new office space in the region.  My guess would be the delay is related to WellCare, but I really have no idea.

Edit:  A little background from the BJ:
https://www.bizjournals.com/stlouis/new ... lding.html

They also recently opened office space in Westport.

8,905
Life MemberLife Member
8,905

PostJul 11, 2019#1311

Sorry to nitpick but they didn't buy it.  They are leasing it.

sc4mayor
sc4mayor

PostJul 11, 2019#1312

moorlander wrote: Sorry to nitpick but they didn't buy it.  They are leasing it.
No worries lol, I typed that first part from memory before I looked up the BJ article.  Either way, seems they still have a need for space in the region, hopefully they're just slowing things down for WellCare.

4,553
Life MemberLife Member
4,553

PostJul 11, 2019#1313

moorlander wrote:
wabash wrote:Maybe years of sitting unfinished until Clayton coerces then into “beautifying” it, as they did with the big concrete edifice on the western edge of the Centene campus.
Centene pulled the plug on that too.
Didn't realize that. Sorry to hear it. 

3,960
Life MemberLife Member
3,960

PostJul 11, 2019#1314

So is all that is being scrapped the performing arts center? Just trying to nail down exactly what is and isn't being built. What is going between the parking garage and new building? I couldn't find a updated site plan (it has changed multiple times and I can only find the really old ones)

8,905
Life MemberLife Member
8,905

PostJul 11, 2019#1315

jshank83 wrote:So is all that is being scrapped the performing arts center? Just trying to nail down exactly what is and isn't being built. What is going between the parking garage and new building? I couldn't find a updated site plan (it has changed multiple times and I can only find the really old ones)
The residential building and the PAC are out. The area between the building and the garage will be another garage. Apparently Centene will be “beautifying” some of these blank walls eventually but what was proposed earlier this year, https://nextstl.com/2019/01/new-mural-p ... za-garage/ , went back to the drawing board.

3,960
Life MemberLife Member
3,960

PostJul 11, 2019#1316

moorlander wrote:
jshank83 wrote:So is all that is being scrapped the performing arts center? Just trying to nail down exactly what is and isn't being built. What is going between the parking garage and new building? I couldn't find a updated site plan (it has changed multiple times and I can only find the really old ones)
The residential building and the PAC are out.  The area between the building and the garage will be another garage.   Apparently Centene will be “beautifying” some of these blank walls eventually but what was proposed earlier this year, https://nextstl.com/2019/01/new-mural-p ... za-garage/ , went back to the drawing board.
I guess i didn't realize it was a sea of garages going in there. Fun

12K
Life MemberLife Member
12K

PostJul 11, 2019#1317

I don't even want to think of the worst-case-scenario of them maybe moving their HQ out of STL?

sc4mayor
sc4mayor

PostJul 11, 2019#1318

^ No need to go down that rabbit hole.  They lease over 1.2 million square feet around St. Louis, some of it only recently leased and not yet occupied.  They're not going anywhere.  My guess is once they have the WellCare deal done you'll have St. Louis as the HQ, Sacramento as a West Coast operation, and then whatever is left of WellCare in Tampa.

2,419
Life MemberLife Member
2,419

PostJul 11, 2019#1319

I'm hoping the WellCare operation is halved in Tampa, with a bunch of it coming to St. Louis/Clayton. 

2,386
Life MemberLife Member
2,386

PostJul 12, 2019#1320

Moving HQ from the region would be extremely unlikely. They've had numerous occasions to do so and clearly have a preference for the region. Most recently before they started construction on the new HQ building. Things change all the time, but IMO that's the far, far, far least likely scenario at this point.

A pure guess would be that the WellCare acquisition and subsequent (almost) doubling of the company, some planning is likely occurring as to where this company will be sitting 10 years down the road. There is plenty of room to build in the StL metro and in downtown Clayton for that matter, but I imagine they would want to re-evaluate and optimize their existing real estate while they can.

9
New MemberNew Member
9

PostJul 12, 2019#1321

framer wrote: I don't even want to think of the worst-case-scenario of them maybe moving their HQ out of STL?
No way they spend half a billion dollars to leave. A large number of board members half deep stl roots.

PostJul 12, 2019#1322

Word on the auditorium and 21 story is that they are still in design. The hole was never gonna stay with or without the auditorium.

12K
Life MemberLife Member
12K

PostAug 14, 2019#1323

Screen grab from Clayco's construction cam directory:


8,905
Life MemberLife Member
8,905

PostAug 16, 2019#1324

Sadly, the garages are looking much worse than even the renderings portrayed.

2,386
Life MemberLife Member
2,386

PostAug 18, 2019#1325

Agreed. There's a serious need for something substantial on the South end of this area. I have a hard time thinking Centene wont use the land as they already own it and are expanding exponentially. Hope that ends up being the case. If not, this will still be a win overall, but just barely IMO.