PostApr 17, 2025#51

I remember riding down Tower Grove in the spring of 2023 confidently telling my friends that they were starting construction in the fall 😂

1,092
Expert MemberExpert Member
1,092

PostApr 17, 2025#52

It is so embarassing for the city how they haven't started this project promised for years. Unlike the other protected bikelines they're working on North Grand and Market st, this is actually a popular bicycle route and yet it looks exactly the same as it ever has. 

2,620
Life MemberLife Member
2,620

PostApr 17, 2025#53

They have also just let the road surface deteriorate to embarrassing/dangerous levels. It's a moonscape right now.

259
Full MemberFull Member
259

PostApr 17, 2025#54

It was out for bid on the SLDC plan room. Think bidding has closed, so const. start anytime now. 

But yes, these infrastructure upgrades have been dragging. IMO, Jones could've swept if arterials and safety improvements were donea year earlier than expected completion. 

2,620
Life MemberLife Member
2,620

PostApr 17, 2025#55

They are currently ripping down most of the trees on that side of the street, hopefully that is a sign of things starting. I will miss those shady mature oaks though.

2,430
Life MemberLife Member
2,430

PostApr 17, 2025#56

^ I was kind of shocked this  morning to see that.... I thought the past few days they were doing trimming but then realized, oh, they're chopping them down!

1,092
Expert MemberExpert Member
1,092

PostApr 17, 2025#57

Off topic but the City really needs to have some sort of policy about trying to preserve mature shade-providing trees when possible, especially with climate change. I know about the ash borer and all that but over the last few years we've lost a lot of tree cover and the replacements are always small seedlings. 

13K
Life MemberLife Member
13K

PostApr 17, 2025#58

These trees?
Tower Grove Connector Rendering.jpg (330.48KiB)

36
New MemberNew Member
36

PostApr 17, 2025#59

They also just released this call for artists to install a mural under I-44 (which I think will be a fantastic addition): https://www.towergroveconnector.com/public-art
The PDF linked from that site says that construction will be starting June 2025. Between this, the removal of trees and the end of bidding, I feel good about this finally breaking ground very soon.

2,430
Life MemberLife Member
2,430

PostApr 17, 2025#60

^ hopefully so!

^^ no. the gigantic trees abutting MOBOT's historic stone wall. 

6,660
AdministratorAdministrator
6,660

PostApr 17, 2025#61

There was a group of BPS and Streets folks out there looking at things and talking last Thursday afternoon. Hopefully that is an additional good sign.

13K
Life MemberLife Member
13K

PostApr 17, 2025#62

STLrainbow wrote: ↑
Apr 17, 2025
^^ no. the gigantic trees abutting MOBOT's historic stone wall. 
Isn't that the MOBOT historic stone wall right there?

36
New MemberNew Member
36

PostApr 17, 2025#63

Re. the trees: This is on Reddit (and supposedly from the Shaw FB group): 
Screenshot (25).png (91.31KiB)

488
Full MemberFull Member
488

PostApr 17, 2025#64

J S wrote: ↑
Apr 17, 2025
Re. the trees: This is on Reddit (and supposedly from the Shaw FB group): Screenshot (25).png
Good explanation.  Lets start moving dirt. Best time to do it was 3 years ago, but lets get going now.

788
Super MemberSuper Member
788

PostApr 18, 2025#65

quincunx wrote: ↑
Apr 17, 2025
STLrainbow wrote: ↑
Apr 17, 2025
^^ no. the gigantic trees abutting MOBOT's historic stone wall. 
Isn't that the MOBOT historic stone wall right there?
Yeah there are mature trees where the flower beds are pictured on the left and then again farther up the road. 

PostApr 18, 2025#66

J S wrote: ↑
Apr 17, 2025
Re. the trees: This is on Reddit (and supposedly from the Shaw FB group): Screenshot (25).png
They only have another 30-50 years left, we must cut them down! Are they saying they will cut down 30-35 trees here and replace them with 100 in the same area or 100 trees within the whole project?  They could probably incrementally cut down some and replace them over 15.

2
New MemberNew Member
2

PostMay 14, 2025#67

I've been tracking this project for what seems like 3 or 4 years, and heard it was "definitely" going to get started last year. Now it's mid-2025 and I'm curious if anyone with any real context can help me understand when this work will begin in earnest? I am sad about the loss of those trees, but recognize that we weren't going to get a 2 way cycle track in there with them there (or maybe we could have, I'm no expert). I google the project about once per week but do not see anything suggesting when work will really begin. 

Thanks!

2,672
Life MemberLife Member
2,672

PostMay 14, 2025#68

Website now says construction in 2026. St. Louis’s ability to execute a streets project may rank last place in the world for a city its size. Embarrassing.

406
Full MemberFull Member
406

PostMay 14, 2025#69

addxb2 wrote: ↑
May 14, 2025
Website now says construction in 2026. St. Louis’s ability to execute a streets project may rank last place in the world for a city its size. Embarrassing.
...you have got to be kidding me....wtaf.....

2
New MemberNew Member
2

PostMay 14, 2025#70

addxb2 wrote: ↑
May 14, 2025
Website now says construction in 2026. St. Louis’s ability to execute a streets project may rank last place in the world for a city its size. Embarrassing.
Website says June 2025 for me. IDK where you see 2026

2,672
Life MemberLife Member
2,672

PostMay 14, 2025#71

Raceman95 wrote:
addxb2 wrote: ↑
May 14, 2025
Website now says construction in 2026. St. Louis’s ability to execute a streets project may rank last place in the world for a city its size. Embarrassing.
Website says June 2025 for me. IDK where you see 2026
“As of October 2024, Design of Phase 2 continues to progress according to schedule. Integrating feedback from the Public Open House, Phase 2 design is expected to be completed in 2025 with construction following in 2026.”

Under phase 2. https://www.towergroveconnector.com/abouttheproject

I see that I read the page incorrectly now.

2
New MemberNew Member
2

PostMay 14, 2025#72

addxb2 wrote: ↑
May 14, 2025
Raceman95 wrote:
addxb2 wrote: ↑
May 14, 2025
Website now says construction in 2026. St. Louis’s ability to execute a streets project may rank last place in the world for a city its size. Embarrassing.
Website says June 2025 for me. IDK where you see 2026
“As of October 2024, Design of Phase 2 continues to progress according to schedule. Integrating feedback from the Public Open House, Phase 2 design is expected to be completed in 2025 with construction following in 2026.”

Under phase 2. https://www.towergroveconnector.com/abouttheproject

I see that I read the page incorrectly now.
Yup. Phase 2 is the section of Sarah, not Tower Grove Ave / Vandy

259
Full MemberFull Member
259

PostMay 14, 2025#73

Michael Browning mentioned “next couple months” under construction in the March 2025 edition of the Griffin newspaper.

2,672
Life MemberLife Member
2,672

PostMay 14, 2025#74

Looking back at the project (Connecting St. Louis) that inspired both Tucker Boulevard and the Tower Grove Connector. The plan put together by Trailnet supported by membership dues, private gifts/donations, and talented planners on staff (myself included). Tucker wasn't real until Cotar committed $30K to complete initial engineering. Tower Grove wasn't real until Arch to Park's Jason Hall was Trailnet's Gala speaker. Trailnet deserves to see these projects come to life.... finally.

2,430
Life MemberLife Member
2,430

PostJun 05, 2025#75

It's Happening, People! This Is Not A Drill!

KMOV had a report and City is saying work should start this month on Phase One (South end(
https://www.firstalert4.com/2025/06/04/ ... k-midtown/