PostJul 29, 2017#101

I hope they release a new rendering

3,762
Life MemberLife Member
3,762

PostJul 29, 2017#102

ssmith wrote:
Jul 29, 2017
A few changes: red brick veneer vs. concrete panels. Also increasing parking from 115-122 to 130 spaces.
F*CKING NIMBYS... F*CK.

12K
Life MemberLife Member
12K

PostDec 12, 2017#103

Updates from NextSTL, including design tweeks:

https://nextstl.com/2017/12/compton-hil ... g-forward/


41
New MemberNew Member
41

PostDec 20, 2017#104





http://www.stltoday.com/business/column ... op-story-2
Demolition of the old YMCA on South Grand Boulevard is expected to begin this winter as Altus Properties starts construction on a new 124-unit apartment building.

The $19 million project slated for the 2200 block of South Grand Boulevard, now home to the vacant community center, is expected to be complete in the second quarter of 2019. A construction permit for the five-story building was filed with St. Louis this month. 

12K
Life MemberLife Member
12K

PostFeb 01, 2018#105

Vintage photo stolen from Facebook:


1,982
Never Logs OffNever Logs Off
1,982

PostFeb 01, 2018#106

I've been wondering about the progress on this rehab lately. I am TOTALLY blanking on the word for it, but they had the framing along the south side of the building for a long time, but I couldn't note any progress. Eventually, though, I think I saw someone working on it, and then recently I noticed that the framing moved to the west side of the building.

So although I can't see it, it seems likely things are indeed happening. Even with a business I'm unlikely to frequent, I'm really excited to see this one happen.

2,430
Life MemberLife Member
2,430

PostFeb 01, 2018#107

^ And don't forget the residential units up top.

Working on the weekend...


226
Junior MemberJunior Member
226

PostFeb 01, 2018#108

Scaffolding :wink:

I noticed the same. And although they moved the scaffolding from the south side...that side still looks pretty rough. When I drive by at night, there are always lights on inside and it looks some some framing taking place.

Are apartments planned for the upper floors?

PostFeb 01, 2018#109

^^ ah thanks, just missed your post.

1,982
Never Logs OffNever Logs Off
1,982

PostFeb 01, 2018#110

rheights wrote:
Feb 01, 2018
Scaffolding :wink:

6,662
AdministratorAdministrator
6,662

PostFeb 23, 2018#111

Fence was going up around the full site yesterday and abatement in the YMCA is underway. Spirtas is also mobilizing equipment for the full demolition, and Holland Construction has a couple office trailers on site.

13K
Life MemberLife Member
13K

PostMar 10, 2018#112

Permit issued

MBR SOUTH GRAND PROPERTY LLC Building 12/04/2017 03/01/2018 MULTI FAMILY $18,600,000.00 CONSTRUCT MULTI FAMILY BUILDING PER PLANS

PostMar 10, 2018#113




2,330
Life MemberLife Member
2,330

PostMar 15, 2018#114

As of yesterday the Y is coming down.

6,152
Life MemberLife Member
6,152

PostMar 16, 2018#115

^It was fully half gone this afternoon when I drove past. The back wall of the pool is there, and a little of the north wall. The south wall is almost entirely gone. (I think there might be one, or maybe two roof trusses still in the very back.) There's still a little to the north of the pool area where there's some roof and almost three complete walls. But I think the walls facing Grand are entirely gone site wide. It's a dollhouse now. Sort of. Half a dollhouse. Sorry to see it go, but that site needs redevelopment.

1,610
Totally AddictedTotally Addicted
1,610

PostMar 16, 2018#116

symphonicpoet wrote:
Mar 16, 2018
^It was fully half gone
In my day, we just called that "half gone"

12K
Life MemberLife Member
12K

PostMar 16, 2018#117

ricke002 wrote:
Mar 16, 2018
symphonicpoet wrote:
Mar 16, 2018
^It was fully half gone
In my day, we just called that "half gone"
I like to think it's still "half there".

6,152
Life MemberLife Member
6,152

PostMar 17, 2018#118

ricke002 wrote:
Mar 16, 2018
symphonicpoet wrote:
Mar 16, 2018
^It was fully half gone
In my day, we just called that "half gone"
Heh! I gather you're not overfond of the darker shades of purple in your prosodic explorations? ;-)

PostMar 18, 2018#119

I'd say it's now well more than half gone.



The rear wall to the pool area is gone now, and things beside it. I think they must have worked the site today, as I'd have sworn there was still structure visible that had been exposed by removing the last of the pool area this morning, but this afternoon . . .

Don't blink.

Sorry to see it go. It was a neat old structure. I just hope the new one lives up to its potential. (I believe it might this time.) Glad to see the Pelican getting the proper treatment.

13K
Life MemberLife Member
13K

PostJun 26, 2018#120




12K
Life MemberLife Member
12K

PostJun 27, 2018#121

Are the renders posted by Hoffa in December the final design; what's actually being built?

1,465
Veteran MemberVeteran Member
1,465

PostJun 28, 2018#122

Impressive roof work on the Pelican. Love the pattern/design. Was able to zoom in on NextSTL's tweet pic.

5,261
Life MemberLife Member
5,261

PostJun 28, 2018#123

framer wrote:
Jun 27, 2018
Are the renders posted by Hoffa in December the final design; what's actually being built?
They are the final renderings of the design. That is what is being built.

13K
Life MemberLife Member
13K

PostSep 30, 2018#124


6,152
Life MemberLife Member
6,152

PostSep 30, 2018#125

^As I sad over on the Victor thread, great pictures and a great post.

And since this is at least closer to the right location . . .

Slightly off topic, but I will second the blogger's recommendation for Pho Long. My wife and I needed a new pho joint after losing Kim Ngan last week. She's really darn picky about her Vietnamese noodle soups, being a native of a small town near Saigon and longtime Saigon resident. The Pho Long namesake dish got her stamp of approval. It was more savory than I'm accustomed to. Rich and delicious. Good meatballs, too. The atmosphere feels more polished and American, but the food was dead delicious. And the prices were reasonable. ($31 for the two of us, after tip, for pho dac biet, pho with flank, and a durian shake. You can get by cheaper if you get more basic soup, which is still plenty filling, and skip desert. Or you could spend more, if you add in drinks or appetizers. Assuming you can find space.)

Anyway . . . great to see all the construction and the Pelican looks fantastic.