455
Full MemberFull Member
455

PostJan 29, 2016#576

moorlander wrote:$42Billion!
The doubling in revenue is the result of the planned merger with HealthNet which should close 1Q2016.

Greg

1,864
Never Logs OffNever Logs Off
1,864

PostFeb 04, 2016#577

Nextstl has a new Centene article back up on the main page now. Looks like the same content as the previous one to me, or extremely similar. Site clearing has begun.

472
Full MemberFull Member
472

PostFeb 04, 2016#578

Does Centene also own that patch of empty grass to the south of their glass box? Do they have plans for it or is it like the downtown plaza that the Ambassador Theater once stood on? (Doesn't anyone else often think that HoK designs generally suck?)

12K
Life MemberLife Member
12K

PostFeb 04, 2016#579

^Yes, Centene owns the grassy knoll. That's where they originally planned the phase II tower, but looks like plans have changed.

8,155
Life MemberLife Member
8,155

PostFeb 04, 2016#580

All I can do about this Centene project is hope it doesn't take another couple hundred jobs from Downtown STL.
(Moment of silence for Armstrong Teasdale






carry on.)

8,912
Life MemberLife Member
8,912

PostFeb 04, 2016#581

framer wrote:^Yes, Centene owns the grassy knoll. That's where they originally planned the phase II tower, but looks like plans have changed.
The new parking garage with the wind feature is at capacity now so any new tower on the grassy knoll would require an additional parking garage. I'm sure they decided they wanted the new tower on the same side of the street as the new parking garage.

PostFeb 09, 2016#582

Buildings will be down soon and grass planted. Designs will be submitted to the city in about 6 weeks unless Centene decides to dump HOK. Michael Neidorf was visibly PISSED today about the leak (to NextSTL).

5,705
Life MemberLife Member
5,705

PostFeb 10, 2016#583

^ Have to chuckle, went back to the nextstl story and can't figure what exactly was leaked concerning Centene II other then except the obvious pictures of warning tape and drill truck taking core samples. Maybe the references to # of stories and boutique hotel but believe boutique hotel has been discussed as part of phase II as per request of the city. Unless I'm missing something here.

1,864
Never Logs OffNever Logs Off
1,864

PostFeb 10, 2016#584

Ehh, probably more along the lines of just not liking the fact that people are talking when they shouldn't be. If this is leaking, what other proprietary information might be getting leaked too?

We love the leaked info, but from an organization standpoint, I can understand why they may not.

4,553
Life MemberLife Member
4,553

PostFeb 10, 2016#585

moorlander wrote:Buildings will be down soon and grass planted.
Greeeeeaaaaaat. Hopefully this "Phase II" grassy knoll doesn't hang around as long as the first one.

8,912
Life MemberLife Member
8,912

PostFeb 19, 2016#586

Jersey barriers are up and a large (demo?) crew is present.

PostFeb 23, 2016#587

Centene doesn't skimp on construction fencing. They're painting everything!


313
Full MemberFull Member
313

PostFeb 24, 2016#588

^ This seems like standard procedure for an urban project in the US, no?

2,386
Life MemberLife Member
2,386

PostFeb 24, 2016#589

^Not even in the slightest. Directly related to the developer and/or marketing of the project. I've seen some pretty nasty construction fencing.

1,320
Veteran MemberVeteran Member
1,320

PostFeb 25, 2016#590

They're even painting the concrete barriers to match.

472
Full MemberFull Member
472

PostFeb 25, 2016#591

Randy wrote:^ This seems like standard procedure for an urban project in the US, no?
Did you mean Western Europe?

12K
Life MemberLife Member
12K

PostMar 02, 2016#592

The Post is reporting that Centene's new building will be 20 stories, and 500,000 sq. ft.

http://www.stltoday.com/business/column ... 495b2.html

8,912
Life MemberLife Member
8,912

PostMar 02, 2016#593

For comparison, the current tower is 17 stories, 263ft tall, and somewhere between 460k and 485k sq ft

313
Full MemberFull Member
313

PostMar 02, 2016#594

^ Imagine a 37 story tower at Ballpark Village with the right planning and partnerships.

5,705
Life MemberLife Member
5,705

PostMar 02, 2016#595

^ I believe PD noted that other tenants are expected to fill some of the 500,000 square feet.

Another note about that number, it is essentially the proposed amount of space of Cortex US Metals site if not mistaken. Still believe Cortex/Wexford need to get their hustle on with Centene phase II moving forward and another office tower most likely breaking ground in Clayton CBD. Clayton CBD is going to have 100-200k of Class A space on the market.

8,912
Life MemberLife Member
8,912

PostMar 02, 2016#596

Goodbye metaphase



12K
Life MemberLife Member
12K

PostMar 02, 2016#597

I'm really anxious to see if the new tower will be a twin to the first, or if it will be a completely different design.

8,912
Life MemberLife Member
8,912

PostMar 02, 2016#598

If it's a twin It won't be the same glass. I hear that glass is not longer manufactured.

1,864
Never Logs OffNever Logs Off
1,864

PostMar 02, 2016#599

Do you know who the glass supplier was? I have a hunch that it was probably a PPG product: either Solarban, Sungate, or Starphire. I tried looking it up on Emporis, but I don't have the access to see the supplier.

8,912
Life MemberLife Member
8,912

PostMar 02, 2016#600

^No clue