Partner Projects
![]()
- 20th Street (St. Louis Ave to City SC) - under construction, moving slow.
- Tower Grove Connector - wrapping up Vandeventer segment. Phase 2 construction to follow
- North Grand (Page to Fairground) is under construction. I expect much of it to be visually complete by Spring of 2027.
- Spring (Page to Lindell) breaks ground in the Fall. (South Spring from SLU to Foundry) has been designed, unknown timeline
- Market Street (Arch to Tucker) submitted for federal funding. Insight from Downtowners? (Tucker to City SC) before 2030 start.
- Spring I-64 Crossing breaks ground in 2027.
- Clayton Rd breaks ground before 2030.
- Metrolink ROW, connection to Foundry route being re-evaluated
- St. Louis Ave. - no date set, in planning.
- Forest Park Parkway (Grand to Compton) - unknown timeline (likely part of the Future 64 improvements).
- Washington Loop (added segment since Brickline inception) - unknown timeline

I found this render of this exact spot and delmar2debaliviere2downtown I think you'll get your wish! lol

I played baseball at Herbert Hoover Boys and Girls Club as a kid. That was over 30 years ago. I remember the old Carter Carburetor factory. It's exciting seeing that this area will get some investment. Beautiful homes still on the surrounding blocks. A lot of multigenerational black families that own their homes and held on through decades of neglect.
N. Grand and University Street is right there just passed that historic brick building on the right.
https://maps.app.goo.gl/odB7uuwnzbUckh8M6
I also needed to know as I was confused where it was at first too!Rick Prieto wrote: ↑8:00 PM - Aug 12thanks for sharing the location
Alright hear me out.....lots of back and forth about N/S Metrolink, BRT, blah blah blah. What if we just run self-driving golf cart taxis on the Greenways....dylank wrote: ↑2:24 PM - Aug 11Partner ProjectsBrickline
- 20th Street (St. Louis Ave to City SC) - under construction, moving slow.
- Tower Grove Connector - wrapping up Vandeventer segment. Phase 2 construction to follow
- North Grand (Page to Fairground) is under construction. I expect much of it to be visually complete by Spring of 2027.
- Spring (Page to Lindell) breaks ground in the Fall. (South Spring from SLU to Foundry) has been designed, unknown timeline
- Market Street (Arch to Tucker) submitted for federal funding. Insight from Downtowners? (Tucker to City SC) before 2030 start.
- Spring I-64 Crossing breaks ground in 2027.
- Clayton Rd breaks ground before 2030.
- Metrolink ROW, connection to Foundry route being re-evaluated
- St. Louis Ave. - no date set, in planning.
- Forest Park Parkway (Grand to Compton) - unknown timeline (likely part of the Future 64 improvements).
- Washington Loop (added segment since Brickline inception) - unknown timeline
YESRuskiSTL wrote: ↑5:39 AM - Aug 14Alright hear me out.....lots of back and forth about N/S Metrolink, BRT, blah blah blah. What if we just run self-driving golf cart taxis on the Greenways....dylank wrote: ↑2:24 PM - Aug 11Partner ProjectsBrickline
- 20th Street (St. Louis Ave to City SC) - under construction, moving slow.
- Tower Grove Connector - wrapping up Vandeventer segment. Phase 2 construction to follow
- North Grand (Page to Fairground) is under construction. I expect much of it to be visually complete by Spring of 2027.
- Spring (Page to Lindell) breaks ground in the Fall. (South Spring from SLU to Foundry) has been designed, unknown timeline
- Market Street (Arch to Tucker) submitted for federal funding. Insight from Downtowners? (Tucker to City SC) before 2030 start.
- Spring I-64 Crossing breaks ground in 2027.
- Clayton Rd breaks ground before 2030.
- Metrolink ROW, connection to Foundry route being re-evaluated
- St. Louis Ave. - no date set, in planning.
- Forest Park Parkway (Grand to Compton) - unknown timeline (likely part of the Future 64 improvements).
- Washington Loop (added segment since Brickline inception) - unknown timeline
![]()
Imagine what this city would look like today if they had finished all of these project 10 years ago
True. I just wish these timescales weren't so long. I feel my life ticking away waiting for this city to improve itself.
Should GRG put a new item up for a vote in the 3 counties to double the amount we pay into GRG? If it lays out exactly how the new money would be spent and by what new timeline, I believe it would pass. We keep voting to pass region-wide taxes for region-wide improvements. Arch, GRG, MSD, metro link, Page bridge, etc. We could write it to only be applied to the counties that approve, so if St. Charles county votes no, so be it. They get the go-slow current timeline, whereas the county and city could double the timeline speed.GoHarvOrGoHome wrote: ↑2:37 PM - Aug 16True. I just wish these timescales weren't so long. I feel my life ticking away waiting for this city to improve itself.
Why not? No ask, no get.
It would be great to see Jefferson County eventually added to the GRG system as well
It would be great to see Jefferson County eventually added to the GRG system as well