^A word of warning to the wait-and-see approach, symphonicpoet:
I'm personally thinking that seizing the opportunity to build a gold-standard BRT line while the stars are aligned for it to actually get built, unlike any of the past light rail studies above, is wise given this trajectory.
St. Louis's best rail corridor has already been utilized (the Central Corridor) and that is where any substantial population growth and densification is likely to occur in the near term. Plus, the region dropped the ball with the Loop Trolley, damaging public perception of in-street rail projects. I'd rather our next federal funding award be for a different transit mode (that St. Louis completely lacks right now) that could shift the narrative away from failures and missteps.
| Name of Metrolink Study | Year Completed | City of St. Louis Population | St. Louis MSA Population | City as Pct. Of MSA |
| Daniel Boone, Northside, and Southside | 2000 | 348,189 | 2,698,687 | 12.9% |
| Northside-Southside Corridor | 2008 | 309,864 | 2,801,319 | 11.1% |
| Northside-Southside Corridor 2 | 2018 | 302,838 | 2,805,465 | 10.8% |
| Northside-Southside Corridor 3 (BRT) | 2025 | 278,445 | 2,814,421 | 9.9% |
I'm personally thinking that seizing the opportunity to build a gold-standard BRT line while the stars are aligned for it to actually get built, unlike any of the past light rail studies above, is wise given this trajectory.
St. Louis's best rail corridor has already been utilized (the Central Corridor) and that is where any substantial population growth and densification is likely to occur in the near term. Plus, the region dropped the ball with the Loop Trolley, damaging public perception of in-street rail projects. I'd rather our next federal funding award be for a different transit mode (that St. Louis completely lacks right now) that could shift the narrative away from failures and missteps.






