^Half of the roof is gone and four floors of windows have been removed:
![]()

Yes, a ground floor cafeteria along with an outdoor dining patio/common area would be ideal on that corner, but I wouldn't hold your breath. The blank ground floor wall look with elevated/secure green spaces are all the rage these days, especially on the BJC/WUMC campus.dylank wrote: ↑Jun 20, 2021Noticed that the Kingshighway street frontage will be a cafeteria. Seems much improved over the parking decks that are there now.
I think you're probably right, provided that massing study is current. The Parkview Tower Cafe is located on the first floor, at street level, at Kingshighway and Parkview Place with a nice outdoor patio and seating area.dylank wrote: ↑Jun 20, 2021Noticed that the Kingshighway street frontage will be a cafeteria. Seems much improved over the parking decks that are there now.
Interesting. I thought maybe they were just trying to beat winter weather.sc4mayor wrote: ↑Jun 21, 2021^ Supposed to be gone by September, not sure if they're still on target though. This month they extended the demolition hours from 6am to 11pm, Monday thru Saturday.
The amount changed to $60,811,820 and it was issued.quincunx wrote: ↑Jul 03, 2021There's a $114.7M building permit application submitted for CIVIL STRUCTURAL-PHASE 3 (PER PLANS)
That reminds me of a story from an old timer construction worker, about a prank on a jerk supervisor...








Mechanical Penthouse is finally gone, but still half the roof left. Not sure why this is taking so long. They haven't even gotten to the difficult stuff yet.