Looks like they're installing the corrugated panels on the top tier, west facade.
Finally. Talked to a Clayco employee btw. Needless to say, there was in fact a huge delay in the metal paneling. It should be done by now. Apparently a disagreement between an engineer and a manufacturer.framer wrote: ↑Mar 27, 2020Looks like they're installing the corrugated panels on the top tier, west facade.
NAIDesco is marketing the retail space at the corner. A new rendering of the base is included as well. The space is 1,715SF. No lease rate is included. You have to call for that.
285 units remain putting preleased numbers at around 16%.
![]()
![]()
285 units remain putting preleased numbers at around 16%.
Not the best huddle practice for the poor construction workers. ( taken this am )
- 595
Beautiful day today and snapped some pics of St Louis’s new icon ![]()
![]()
![]()
![]()
![]()
![]()
![]()
Sent from my iPhone using Tapatalk






Sent from my iPhone using Tapatalk
^Thanks for the photos. You didn't happen to get a zoomed-in shot of the "articulated" metal panels by any chance, did you?
It's hard to tell from the first image whether or not that is the finished product...but there seems to be a lot of color variation between individual panels and the seams between them are much more visible than expected.
It's hard to tell from the first image whether or not that is the finished product...but there seems to be a lot of color variation between individual panels and the seams between them are much more visible than expected.
Great shots, PB! I think we're starting to see why this will soon become St. Louis' Second Most Photographed Building.
Much of this will not be rented
Where are the tenants coming from and with what money to rent in this tower of babel??
Where are the tenants coming from and with what money to rent in this tower of babel??
- 9,542
Looks like the move-in dates have been bumped out by about a month (3 weeks for the top floors). The website now shows:sc4mayor wrote: ↑Jan 13, 2020It also looks like the floors will lease a bit staggered. 7-14 will be available by July 15th, 15-27 on August 17th, and 28-36 on September 7th.
Floors 7-14: August 15th
Floors 15-27: September 16th
Floors 28-36: September 29th
- 1,864
Are you doing ok? Sincerely asking because you've really gotten pessimistic in recent posts, almost in a way where it reads that you're hoping for these projects to fail.hebeters2 wrote: ↑Apr 03, 2020Much of this will not be rented
Where are the tenants coming from and with what money to rent in this tower of babel??
What's with the Tower of Babel reference? Just because of the geometric design?hebeters2 wrote: ↑Apr 03, 2020Where are the tenants coming from and with what money to rent in this tower of babel??
- 595
You know I didn’t think to do that I gone there mostly to take spring flower shots while there was still a chance. Other than that the building is looking greaturbanitas wrote:^Thanks for the photos. You didn't happen to get a zoomed-in shot of the "articulated" metal panels by any chance, did you?
It's hard to tell from the first image whether or not that is the finished product...but there seems to be a lot of color variation between individual panels and the seams between them are much more visible than expected.
Sent from my iPhone using Tapatalk
- 6,118
^As others have said, those spring flower shots make the building look even better. Great shots. Lovely flowers. Gorgeous building. Well done!
Here's a poor attempt on a cloudy day shooting towards the sun with a cheap camera:
![]()
![]()
![]()



^That's great, thanks.
That looks better than how they appeared in PB's photo, but still, that's an awful lot of seams between panels, and they are pretty noticeable, even from the distance. Maybe they will improve a bit by the time they get to the lower levels.
They are installing panels on the north side of the top tier now.
That looks better than how they appeared in PB's photo, but still, that's an awful lot of seams between panels, and they are pretty noticeable, even from the distance. Maybe they will improve a bit by the time they get to the lower levels.
They are installing panels on the north side of the top tier now.

^ I know, not the best pic of 100 itself, but I like the framing of it.
-RBB