PostJun 28, 2018#1201


261
Full MemberFull Member
261

PostJun 29, 2018#1202

^^Roof at bottom right is prettier than Clayton's entire skyline

1,864
Never Logs OffNever Logs Off
1,864

PostJul 02, 2018#1203

The next round of glass should be going up soon. The maneuverable winch equipment is on site to raise glass panels from within the building itself and they're currently adding the lowest ribbon panels on the NW corner. Look for it to start going up floor by floor at a much faster pace soon.

12K
Life MemberLife Member
12K

PostAug 17, 2018#1204

Wellbridge is moving into their new space on August 27:

https://www.stltoday.com/business/colum ... b12d1.html

PostAug 21, 2018#1205

Looks like the tower should be topped-out sometime in the next week or so.

2,386
Life MemberLife Member
2,386

PostAug 26, 2018#1206

Update from the webcam. Steel is getting close to topping out.


251
Full MemberFull Member
251

PostAug 27, 2018#1207


2,327
Life MemberLife Member
2,327

PostAug 27, 2018#1208

I've a sudden urge to organize my CDs alphabetically/chronologically.

Wait...where are my CDs?

5,705
Life MemberLife Member
5,705

PostAug 27, 2018#1209

^^ Only pre fab could give a full size mock up like that

I'm wondering though, Is the garage above coming together as good as the Ikea furniture I put together for my son last weekend or even the Ikea shelf he put together himself.

6,123
Life MemberLife Member
6,123

PostAug 27, 2018#1210

^Heh!

I've got your CDs for your IKEA grey Prie Kast Siemend model deluxe CD tower.

13K
Life MemberLife Member
13K

PostSep 11, 2018#1211


1,864
Never Logs OffNever Logs Off
1,864

PostSep 11, 2018#1212

Shouldn't be too much longer before all the steel is in place. I'd imagine a topping out ceremony is near. Looks like just some corner beams and the central core (AC / HVAC support?) is all that's left.

Assuming that all happens in the next few days, does the crane come down within the next few weeks?

5,261
Life MemberLife Member
5,261

PostSep 16, 2018#1213

From Thursday...



PostSep 16, 2018#1214

With a half floor left to go, this should be topped of Wednesday.

2,386
Life MemberLife Member
2,386

PostSep 22, 2018#1215

From the webcam it appears as though demolition/excavation has begun for the portion of the project encompassing the lot between the garage and the new Wellbridge space. Will be great to see the streetwall continue down Forsyth and to have some more apartments come online.

5,261
Life MemberLife Member
5,261

PostSep 24, 2018#1216

There appears to be a handful of steel beams left to be placed on the main tower. Elsewhere, the parking garage is coming together, and as newstl2020 said above, excavation and demolition has begun on the residential portion. I think this is going to look exceptional once all the buildings go up. I am thinking that it shouldn't be much longer to will hear something on the residential Tower along Carondelet and the next round of skyscrapers at the wedge site behind the Ritz Carlton. Here are some photos from today from varying angles. The first is from nearly same spot as the photos I posted above.



Here are the new angles...






227
Junior MemberJunior Member
227

PostSep 24, 2018#1217

newstl2020 wrote:
Sep 22, 2018
From the webcam it appears as though demolition/excavation has begun for the portion of the project encompassing the lot between the garage and the new Wellbridge space. Will be great to see the streetwall continue down Forsyth and to have some more apartments come online.
I don't recall there being any residential in phase 1- what residential are you speaking of?

3,967
Life MemberLife Member
3,967

PostSep 24, 2018#1218

tztag wrote:
Sep 24, 2018
newstl2020 wrote:
Sep 22, 2018
From the webcam it appears as though demolition/excavation has begun for the portion of the project encompassing the lot between the garage and the new Wellbridge space. Will be great to see the streetwall continue down Forsyth and to have some more apartments come online.
I don't recall there being any residential in phase 1- what residential are you speaking of?
I think the parking garage is supposed to have apartments on the south side.

709
Senior MemberSenior Member
709

PostSep 25, 2018#1219

^^^ Nice pics Chris, I copied those over to city-data.

^ You are correct, apartment tower will be in subdistrict 2c south of the 2 garages under construction now. Here is the link to the nextstl story though I thought I read later that the tower will not be taller:

https://nextstl.com/2018/03/will-centen ... ng-taller/

2,386
Life MemberLife Member
2,386

PostOct 20, 2018#1220

As of this morning there's a drilling rig on site for the apartment building. Going to be great to get a streetwall going up along Forsyth again.

4,553
Life MemberLife Member
4,553

PostOct 21, 2018#1221

newstl2020 wrote:
Sep 22, 2018
Will be great to see the streetwall continue down Forsyth and to have some more apartments come online.
chriss752 wrote:
Sep 24, 2018
Elsewhere, the parking garage is coming together, and as newstl2020 said above, excavation and demolition has begun on the residential portion.
newstl2020 wrote:
Oct 20, 2018
As of this morning there's a drilling rig on site for the apartment building. Going to be great to get a streetwall going up along Forsyth again.
What makes you guys think there will be apartments facing Forsyth? I believe the lot along Forsyth - the former Wellbridge site - where the drilling rigs just showed up will just be more garage. The residential will be a standalone building on the south side of the eastern garage, facing Carondelet Plaza. There hasn't been any demolition, drilling, activity, etc... on the Carondelet future residential lot.

5,261
Life MemberLife Member
5,261

PostOct 22, 2018#1222

wabash wrote:
Oct 21, 2018
newstl2020 wrote:
Sep 22, 2018
Will be great to see the streetwall continue down Forsyth and to have some more apartments come online.
chriss752 wrote:
Sep 24, 2018
Elsewhere, the parking garage is coming together, and as newstl2020 said above, excavation and demolition has begun on the residential portion.
newstl2020 wrote:
Oct 20, 2018
As of this morning there's a drilling rig on site for the apartment building. Going to be great to get a streetwall going up along Forsyth again.
What makes you guys think there will be apartments facing Forsyth? I believe the lot along Forsyth - the former Wellbridge site - where the drilling rigs just showed up will just be more garage. The residential will be a standalone building on the south side of the eastern garage, facing Carondelet Plaza. There hasn't been any demolition, drilling, activity, etc... on the Carondelet future residential lot.
I guess I am getting renderings mixed up because a NextSTL Story from June 2017 (on the auditorium) shows a side view of the buildings approaching Hanley on Forsyth and they look like Apartments even with the design revision. Maybe Centene did that to give it "that vibe" but instead will be parking. If that's the case, bummer. As for the Carondelet Lot, I know it has been revised to be taller but I hope they consider changing it from Condos to Apartments. You could have many more people on Carondelet than if you continued the Condo trend there. The Cresent and Plaza add enough Condos to this part of Clayton, add some apartments to tie it all together.

6,123
Life MemberLife Member
6,123

PostOct 22, 2018#1223

chriss752 wrote:
Oct 22, 2018
I guess I am getting renderings mixed up because a NextSTL Story from June 2017 (on the auditorium) shows a side view of the buildings approaching Hanley on Forsyth and they look like Apartments even with the design revision. Maybe Centene did that to give it "that vibe" but instead will be parking. If that's the case, bummer. As for the Carondelet Lot, I know it has been revised to be taller but I hope they consider changing it from Condos to Apartments. You could have many more people on Carondelet than if you continued the Condo trend there. The Cresent and Plaza add enough Condos to this part of Clayton, add some apartments to tie it all together.
Is this the rendering you're talking about?


(Ganked from NextSTL's story of June 7, 2017.)

From Clayco's website that seems nearly current. And it really does look like apartments, but if you read the fine print on the elevations and plans included in the June 7 story it sounds like virtually everything facing Forsyth really is garage.


(From the same story as above.)

Now, there were to be apartments wrapping around the south and east side of the structure, but all of that seems to have changed with the move of the auditorium and the modification of the overall site plan, not to mention the taller narrower apartment/condo structure proposed in the spring. There have been so many changes it's a little dizzying. But the streetwall should be pretty solid by any account, and everything I recall seeing and that I can presently find shows street level retail along Forsyth, so you should have plenty of activity there. Or at least the potential for it.

5,261
Life MemberLife Member
5,261

PostOct 22, 2018#1224

^The second elevation image is what fooled me. Oh well. At least we will get a taller condo tower and retail at the base of the garage.

1,864
Never Logs OffNever Logs Off
1,864

PostOct 26, 2018#1225

Prep work on the pedestrian bridge has begun. They added a separate construction camera for it: https://app.oxblue.com/open/clayco