Ruh Roh...

"Metro Transit has delayed the opening of a new extended section of the platform at the Central West End MetroLink station after an inspection identified what the agency called "a potential issue."

Metro officials didn't elaborate.

The opening had been scheduled for last Friday. A new opening date has yet to be determined, a spokesman said."

https://www.stltoday.com/news/traffic/a ... the-latest

4,553
Life MemberLife Member
4,553

PostJan 28, 2019#2

Hopefully Metro can get this figured out quick.

The sooner the disruptions of the Cortex station construction followed immediately by CWE platform extension construction can be over the better.

115
Junior MemberJunior Member
115

PostJan 29, 2019#3

Does anyone know the full plan for the redo? This is my work stop, and it's pretty much busy at all hours of the work day.

For some reason, I was under the impression that the stopping points would shift so that the Eastbound/Westbound trains weren't potentially stopped at the same spot. All I can see is that the platform has been extended several feet to the east and they've added a couple of new benches, but that's it.

I certainly hope that the update will include something to alleviate the congestion at the bottom of the main steps.

Jeff

sc4mayor
sc4mayor

PostJan 29, 2019#4

As far as I know, the only thing they were doing was extending the platform a bit to provide some more space. I'm not aware of any other plans or improvements.

692
Senior MemberSenior Member
692

PostJan 30, 2019#5

Yeah, the trains will be using opposite ends of the platform, per Matthew Hibbard on reddit.
Since there is a high volume of riders at the Central West End MetroLink Station, we need to spread the crowd out a bit. We are limited in our space at this particular location, so we decided to extend the platform about 60 feet to the east. This change will create a shift in boarding at this station. Eastbound riders will use the eastern part of the platform (which will include the new extended portion) and westbound riders will use the western part of the platform.

115
Junior MemberJunior Member
115

PostJan 30, 2019#6

^Perfect - thanks!

Wonder if a new covered structure will go in to help differentiate/divide up the crowd?

Jeff

sc4mayor
sc4mayor

PostJan 30, 2019#7

jeffrk wrote:
Jan 30, 2019
^Perfect - thanks!

Wonder if a new covered structure will go in to help differentiate/divide up the crowd?

Jeff
This one I can answer for sure. I had asked Metro on Facebook awhile back about the potential for a canopy that would match the Cortex station, which I think would be pretty nice, and their reply was that there are no plans to add any new or additional canopies. No money, kinda wish BJC would have sprung for that.

692
Senior MemberSenior Member
692

PostFeb 06, 2019#8

They seem oddly secretive about whatever the problem is. They didn't even bother responding to a follow up. But this vague answer makes it seem like it's a pretty major problem, if they're still figuring out the solution two weeks later.

From Metro's STLtoday chat.
An issue was revealed during the final inspections of the platform extension project, and Metro’s Engineering team is currently analyzing the cause and working with the project contractor to determine the best solution. Our goal is to get the extension and walkway opened as soon as possible, and we will keep everyone updated on the project’s progress.

PostMar 05, 2019#9

The delay continues, and the secrecy continues to be really, really odd.
We do not have any additional details to provide at this time other than what was provided here: http://www.metrostlouis.org/news-releas ... postponed/

115
Junior MemberJunior Member
115

PostMar 06, 2019#10

eee123 wrote:
Mar 05, 2019
The delay continues, and the secrecy continues to be really, really odd.
We do not have any additional details to provide at this time other than what was provided here: http://www.metrostlouis.org/news-releas ... postponed/
Yes, it is rather odd...

I did notice that just the other day they installed hand rails on either side of the new ramp, so maybe that was the oops?

4,553
Life MemberLife Member
4,553

PostMar 06, 2019#11

Too bad that after the successful rollout of the Cortex Station this CWE platform debacle has dented Metro's credibility. Someone - or multiple people - screwed up. They should admit it and move on.

13K
Life MemberLife Member
13K

PostMar 09, 2019#12

Opens Monday

39
New MemberNew Member
39

PostMar 11, 2019#13

First day with the new extension at CWE. Some confusion especially with people still waiting closest to the stairs for the eastbound train but I expect people will get used to it in time. They really need to install a barrier on that or both sections where the train doesn't stop but people still walk by. It'll reduce confusion and make the platform a lot safer, what with people shuffling about especially during rush hour. I hope Metro budgeted money to do that.

13K
Life MemberLife Member
13K

PostMar 11, 2019#14


12K
Life MemberLife Member
12K

PostMar 12, 2019#15

Those steam pipes are just crying out to be shot by a really good fine-art photographer.

6,158
Life MemberLife Member
6,158

PostMar 12, 2019#16

^They really are very cool. Too bad I'm a fairly-artless photographer. ;-)

39
New MemberNew Member
39

PostMar 13, 2019#17

framer wrote:
Mar 12, 2019
Those steam pipes are just crying out to be shot by a really good fine-art photographer.
I love the blend of industrial- and urban-looking structures at that station! I've felt compelled to take photos on my phone but I'm no photographer. Yes, and in all weather and times of day!

53
New MemberNew Member
53

PostMar 14, 2019#18



I was out on the system taking photos for other transit stories I'm working on. Here's my attempt...

12K
Life MemberLife Member
12K

PostMar 14, 2019#19

^Nice. Is that taken from a public area, or is it insiders-only? It would be great to be able to get down amongst all the pipes etc.

53
New MemberNew Member
53

PostMar 14, 2019#20

This photo was shot on the mezzanine (public area) near the stairwell leading unto the MetroLink platform.

6,158
Life MemberLife Member
6,158

PostMar 15, 2019#21

Excellent! It really is a great subject.

4,553
Life MemberLife Member
4,553

PostMar 26, 2019#22

moltingcicada wrote:
Mar 11, 2019
First day with the new extension at CWE. Some confusion especially with people still waiting closest to the stairs for the eastbound train but I expect people will get used to it in time. They really need to install a barrier on that or both sections where the train doesn't stop but people still walk by. It'll reduce confusion and make the platform a lot safer, what with people shuffling about especially during rush hour. I hope Metro budgeted money to do that.
I can't believe this wasn't incorporated into the platform construction project, although I suppose they were still using the original part of the platform during construction. Hopefully they do add some sort of barrier or indication of which end boarding occurs at for each side.

115
Junior MemberJunior Member
115

PostDec 20, 2019#23

Greetings all. Further changes to the CWE Metrolink stop to occur:

https://facilities.med.wustl.edu/2019/12/construction-for-major-upgrade-of-central-west-end-metrolink-station-begins-monday-dec-16/

Sounds like good changes. Just too bad that the platform isn't a tad wider.

sc4mayor
sc4mayor

PostDec 22, 2019#24

^ Anyone know what the new canopy will look like?

75
New MemberNew Member
75

PostDec 23, 2019#25

sc4mayor wrote:
Dec 22, 2019
^ Anyone know what the new canopy will look like?
It will be "V" shaped glass panels. Entrance should look quite a bit nicer and move inviting. 

Previous designs included screening the pipes on the south end, not sure what final version will have. 