It really isn’t that simple. There was plenty of traction with the (1) original plan, (2) previous federal administrations both Obama/Biden and Trump’s first term, (3) different build environment, and (4) stronger transit utilization.
The best time to build was 2018-2020 but since then every variable necessary for this project has gone the wrong direction.
Population along the northern section is at an all time low. This was made worse by the route change which removed Downtown’s nodal and density benefits. Infrastructure costs are at an all time high. Public transportation use is still 60-70% what it was. The federal transit administration is unrecognizable thanks to Elon Musk. Not to mention, Missouri lost sane representation willing to fight for regional transit funding.
It’s why I’m so vocal about this. Leaders locally, state, and federally failed this project and Cara Spencer shot a horse with four broken legs.
The best time to build was 2018-2020 but since then every variable necessary for this project has gone the wrong direction.
Population along the northern section is at an all time low. This was made worse by the route change which removed Downtown’s nodal and density benefits. Infrastructure costs are at an all time high. Public transportation use is still 60-70% what it was. The federal transit administration is unrecognizable thanks to Elon Musk. Not to mention, Missouri lost sane representation willing to fight for regional transit funding.
It’s why I’m so vocal about this. Leaders locally, state, and federally failed this project and Cara Spencer shot a horse with four broken legs.